Tender Conditions The Android tablet computer is powerful, not only can carry a wealth of consumer entertainment applications, the bottom layer of Android uses the Linux kernel as the core, it can also achieve mobile business office, wireless Internet access anytime, anywhere. L-type Series,L-type tablet,L Shaped tablet,L-type Android Tablet,L-type touch Tablet,L-type Digital Signage Shenzhen Hengstar Technology Co., Ltd. , https://www.angeltondal.com
Windows Tablet PCs are pregnant with major business opportunities. Qualcomm's G-tablet business tablet, which makes up for the inconvenience of using the iPAD of iOS system and a series of Android tablets in terms of usage habits and software compatibility, has opened up a new field of tablets for the majority of Windows loyal users who have been troubled.
Zhaoqing Huaiji Power Supply Bureau in contact with the water supply and other eight technical business housing project tender notice
The engineering supervision project for eight technical business houses, including the Qiqing Water Supply Bureau of the Zhaoqing Huaiji Power Supply Bureau, has been approved by the Huaifa Development and Reform Bureau and other relevant authorities with document number Huaifa Investment [2017] No. 342. The project construction has been completed. The executing entity is the Zhaoqing Power Supply Bureau of Guangdong Power Grid Co., Ltd. The funding for the construction comes from self-owned capital and bank loans. The tenderer is also the Zhaoqing Power Supply Bureau of Guangdong Power Grid Co., Ltd. The project is now ready for bidding, and the construction supervision is open to public tender.
2. Project Overview and Scope of Tender
2.1 Construction Site: Zhaoqing City
2.2 Construction Scale: This project includes eight technical housing units under construction across several power supply stations, such as the Qiaison Power Supply Station of Huaiji Power Supply Bureau, Ganshao Power Supply Station of Huaiji Power Supply Bureau, Wuhe Power Supply Station of Guangning Power Supply Bureau, Xinyi Center Power Supply Station of Deqing Power Supply Bureau, Jindu Power Supply Station of Gaoyao Power Supply Bureau, Fengkai Power Supply Bureau, Central Power Supply Station, Jiushi Power Supply Station of Deqing Power Supply Bureau, and Shiqi Power Supply Station of Guangning Power Supply Bureau. For detailed information, please refer to the construction drawings.
2.3 Planned Duration: 306 calendar days, with a planned start date of March 1, 2018, and a scheduled completion date of December 31, 2018. (The actual start and completion dates will be based on official reports).
2.4 Scope of Tender: The tender covers the full-process electronic supervision of the project, including pre-construction, construction, final settlement, defect liability period, and warranty period. Bidders are required to use the project information management system as specified by the client. For more details, please consult the tender documents.
2.5 Tender Division: This project is divided into one single bid section.
3. Qualification Requirements for Bidders
3.1 The bidder must have independent legal person status and hold a valid business license.
3.2 Qualification Requirements: Must possess engineering supervision qualifications or supervisory qualifications for housing construction projects at level C or above.
3.3 Supervising Engineer Requirements: A registered supervising engineer must be available, with their practicing certificate and affiliated unit clearly stated in the bid application.
3.4 Credit Requirements: The bidder must not be restricted from participating in bidding by local government authorities or China Southern Power Grid Co., Ltd. and its subsidiaries.
3.5 Consortium bids are not accepted.
3.6 Additional Requirements: If the bidder (including its principal, agent, or any related entity involved in sales, labor, or service relationships) has participated in any bidding or economic activities within the China Southern Power Grid Corporation system and has engaged in illegal activities, the company will not accept their participation in future tenders for a specified period. The specific time frame will be determined based on records and handling of bribery-related information provided by suppliers of China Southern Power Grid. These requirements are implemented according to the relevant provisions of the Measures.
4. Acquisition of Tender Documents
4.1 Interested bidders are requested to obtain the tender documents during working hours from 09:30 to 11:00 and from 14:00 to 16:00 (Beijing Time), between December 14, 2017, and December 19, 2017.